TMI winter work included hull and superstructure paint and generator repower for Lotus (125' Newcastle), ABS tank inspection, hull soundings and paint, and Caterpiller main engine service for S/Y Enterprise (142' Perini Navi).

Work also included hull and superstructure paint, hydraulic crane work, and muffler repairs and plating for Michaela Rose (162' Schweers), tank work and bottom coatings for Top Times (113' Burger), a 5 year Lloyd' s survey, exhaust mods, and A/V upgrades for Domani (145' Benetti) and deck work and bottom coatings for S/Y Erica XI of Hamilton (99' Jongert).