As
part of long-term capital improvement
plans, TMI is currently upgrading the main maintenance shed with new
ventilation and lighting systems.

The
ventilation system will be capable of filtering particulate from the
air and creating positive pressure to eliminate dust. The
installation is scheduled for completion the end of July.
The
interior beams of the shed were painted earlier this spring,
resulting in more reflective light. This combined with the
installation of improved lighting later this season will result in
greater work efficiency.
Other
scheduled maintenance this summer includes dredging the basin to
maintain 14’ at low water and installation of new floating docks at
the marina.